WDROŻENIA/IMPLEMENTATION

Downloads / Dokumenty do pobrania:

Reports on implementation 2007 (M:13-24) / Raporty na temat wdrożeń  2007 (M:13-24)

General report / Raport ogólny:
Demonstration_D5-3-13_LODZ_2007_M13-24_FINAL.pdf

Design of the Zabieniec reservoir / Projekt zbiornika Zabieniec:
DEMO_LODZ_2007_M13-24_Zabieniec Reservoir_FINAL

Vegetation belt at the Teresa reservoir / Pas roślinności na zbiorniku Teresy:
DEMO_LODZ__2007_M13-24_Vegetation belt_FINAL

Tree stock taking in the Sokolowka river valley / Inwentaryzacja drzewostanu w dolinie rzeki Sokolowce:
DEMO_LODZ_2007_M13-24_Sokolowka Park

Willow plantationst at the WWTP / Plantacje wierzbowe – GOS:
DEMO_LODZ_2007_M13-24_Willow plantations_FINAL.pdf

Draft of the Sokolowka brochure / Wstępny projekt broszury Sokolowki:
Sokolowka_draft_p1, Sokolowka_draft_p2


The major goal of the Demonstration Project is to demonstrate application of Ecohydrology as an integral and essential part of the sustainable Integrated Urban Water Management.Selection of two pilot catchments allowed tackling a comprehensive scope of water related issues specific for the city and validate ecohydrology concept tested in meso- scale:
Project 1: Sokolowka river Restoration of a municipal river for stormwater management, increase of water retentiveness and improvement of quality of life;
Project 2: Ner River Sewage system management for environment quality and positive socio-economic feedbacks;
Potential impact: - construction of 2 new reservoirs reduction of stormwater peaks;
- adapting hydrotechnical infrastructure in the new and old reservoirs to ecohydrology principles – reduction of stormwater peaks and improvement of the quality of water in the Sokolowka system;
- ecological restoration of a Sokolowka river section and elaboration of recommendations for replication in other Lodz rivers;
- supporting development of green areas in the river catchment based on hydrological regulation;
- development of operational procedures for the WWTP, including ecological and economical goals;
- elaboration of the DSS for the WWTP sewage sludge utilization and biomass production;
- increase of the amount of green energy production;
- increase of the environmental awareness by using the on-line permanent monitoring systems for environmental education;
- creation of preliminary meta-data base enabling easy access to main environment-focused information;
- active involvement of society in environment enhancement and building of new image of the city;
Downloads / Dokumenty do pobrania:

Projekt demonstracyjny SWITCH w Łodzi: SWITCH Demonstration Project Lodz